Data Center World is part of the Informa Connect Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

April 20-23, 2026
Walter E. Washington Convention CenterWashington, D.C.

2026 Event Schedule

Solution Spotlight: Applied High Voltage | From Interconnection to Reliability: Designing Data Center Power Systems

Mark Scher, P.E.  (President, Applied High Voltage)
Alexandre Nicolas  (President EE & SVP, Electric Powers Consulting)
Location: EXPO Hall, Edge Theater, Booth 1665
Date: Wednesday, April 22
Time: 1:25 pm - 1:45 pm
Pass Type: AFCOM Solution Provider, All Access Conference, Business Hall, Industry Conference, Standard Conference - Get your pass now!
Session Type: Solution Spotlight
Vault Recording: TBD

This session brings together Mark Scher, President of Applied High Voltage, and Alexandre Nicolas, President of Electric Power Engineers, to discuss how interconnection strategy and reliable power system design come together in real projects. They will cover the interconnection process and how requirements translate into resilient, buildable solutions. Through a case study, they will walk through interconnection planning, design, and construction, highlighting key lessons learned from delivering reliable data center power infrastructure. 3 Takeaways: Key steps and challenges in the data center interconnection process How reliability is designed into high-demand data centers Why aligning interconnection strategy with design and construction improves outcomes.