Data Center World is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Tech Talk Presented by Eaton: Eaton Corp.AI Beyond the Hype: Practical Deployment Solutions from the Data Center to the Edge

Ivo Petrov  (Data Center Solutions Architecture, Eaton)

Joe Skorjanec  (Business Development Manager – DC Rack Power and Emergent Technologies)

Location: Room 209A/B

Date: Tuesday, April 15

Time: 11:05 am - 11:55 am

Pass Type: AFCOM Solution Provider, All Access Conference, Industry Conference, Standard Conference - Get your pass now!

Session Type: Sponsored Session

Vault Recording: TBD

Eaton

This session goes beyond the hype to explore practical solutions to deploy AI solutions in your enterprise. The sessions is broken into three sections, exploring impact in the data center, far edge and the future with emerging power topologies. In the data center, discover innovate ways to speed deployment using structural containment. Understand how power redundancy strategies need to evolve and what type of power distribution is needed. See how direct to chip liquid cooling manifolds require a new rack footprint. In the far edge, understand how to deal with having a mini data center, as AI increases network demands. In the emerging power topologies section, learn about new innovations in DC power topologies being deployed for AI, as the 48 volt DC power shelf is changing the way servers are powered with solutions over 100KW. See how next generation +/- 400 volt DC topologies could push the power limits on AI racks over 1MW.

Takeaway

1. Understand how power redundancy strategies need to evolve & what type of power distribution is needed
2. See how direct to chip liquid cooling manifolds require a new rack footprint
3. Understand how network demand increase at the edge for mini data centers implementing AI workloads
4. Learn about new innovations in Direct Current (DC) power topologies being deployed for AI from 48VDC to 400VDC