Data Center World is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Data Center World 2020

As we’ve moved our event dates to August 24-27, please note our Agenda will be updated frequently as we work with our speakers and panelists to schedule the best program possible for you. We appreciate your support and patience.

View, browse and sort the ever-growing list of sessions by pass type, track, and session type. With this Session Scheduler, you can build your schedule in advance and access it during the show via export or with the Mobile App, once live approximately 1 month prior to the event. For your schedule to sync properly with the mobile app, be sure to login to Schedule Builder.

Agenda at a Glance

Keynote: How Dropbox Reduced Costs Significantly by Optimizing its Data Center Footprint

Latane Garetson  (Head of Datacenter Physical Infrastructure, Dropbox)

Location: Lila Cockrell Theatre

Date: Thursday, August 27

Time: 8:00am - 9:00am

Pass Type : All Access, Standard

Track : Keynote Programming

Session Type: Keynote

Vault Recording: TBD

In a dramatic move last year, Dropbox optimized its data center strategy, resulting in a significant cost savings year over year. In this presentation, Latane Garetson, Head of Datacenter Physical Infrastructure at Dropbox, will discuss the strategy of the company’s data center footprint, and how they optimized their west coast strategy to align with these goals. He will also share details around execution of the plan on a tight schedule, and some of the challenges that Dropbox faced along the way.