Data Center World is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Data Center World 2020: A Virtual Experience

Browse and sort the growing list of Data Center World 2020 sessions by pass type, topic, and format.

Agenda at a Glance

Case Study: Designing an Energy-Efficient Supercomputing Center

Michael Strevell  (Project Manager, Supercomputer Infrastructure, Los Alamos National Laboratory)

Adam Brendamour  (Senior Consultant, ESD Consulting)

Location: Data Center World Session Valut

Pass Type : All Access, Standard

Track : Design, Build, Operate & Automate, Case Studies

Session Type: Session

Vault Recording: TBD

This tutorial will step through an actual case study that illustrates the decisions that need to be made in the design of both new and refurbished supercomputer facility alternatives. The HPC data center infrastructure can be a significant enabler or roadblock to the timely deployment of HPC systems. The strategy and technology comparison for these decisions is vital to the success of system deployments. This tutorial will provide a design framework that will highly engage the audience through a mock facility design process. This tutorial will improve your technical knowledge of facility design strategies for new computer deployments.